在生活當中隔離墩模具的用途非常的廣泛,我們經常會在公路,鐵路或者其他的一些地方看到這些模具所生產出來的產品,主要以水泥制品為主?墒呛芏嗟耐庑腥藢τ谒喔綦x墩模具的制作流程并不了解,那么下面小編就給大家簡單的講解一下其制作過程。
Purpose in life isolation pier mold is very wide, we often in highway, railway or some other place to see the mold produced by the product, mainly composed of cement products. But many outsiders for cement isolation pier mold production process do not understand, then below small make up simple explain its production process for you.
一,前期制作過程
首先一定要選擇一個平整干凈的場地,然后澆筑c20混凝土10厘米厚,接著上一層薄鐵皮作為底膜。因為隔離墩墩身模板采用的是定制的鋼模板,所以在安裝模板之前一定要對其進行清洗維修,保證模板的表面沒有其他的雜質,塵土等,并且還要對模板表面進行打磨拋光處理,然后在模板的表面涂刷一層脫模劑,切忌不要使用容易粘在混凝土或者是使混凝土變色的其他油料。
A, pre-production process
First of all, be sure to select a smooth clean site, then pouring c20 concrete 10 centimeters thick, and then on a layer of thin sheet metal as the basement membrane. Because isolation pier template USES a custom steel template, so before installing the template must be cleaning maintenance, to ensure that no other impurities, the surface of the template such as dust, and fine polishing on the surface of the template processing, then coating a layer of mold release agent on the surface of the template, avoid by all means do not use easy to stick in the concrete or discoloring the concrete other fuel.
二,安裝模板過程
在安裝模板時要注意防止水泥漏漿,可在鋼筋上纏一層海綿條或者其他防止漏漿的東西。而隔離墩預埋筋要處剛好在兩塊模板的接縫之處,這樣生產出來的產品才能夠更加的平整光滑。
Two, the installation process template
When installing the template should pay attention to prevent cement slurry leakage, can put a layer of sponge on steel bar or other prevent slurry. And isolation pier embedded reinforcement to place just in the place where two pieces of the seams of the template, so the product can be more smooth.
三,產品成型過程
當模具安裝好之后,操作者要根據所需要的規格制造出鋼筋籠,然后將攪拌均勻的混凝土從攪拌機當中卸出,傾倒到翻斗車上,最后經人工定量放料與鋼筋籠進模具進入傳送帶,經過震臺后再進行手動抹平,產品即可成型。把成品其放在平地上自然的日曬風吹保養一天之后就可脫膜打包,打包之后暈放到臨時的堆放點待產品硬度達標之后即可出貨。
Three, the product forming process
When the mould is installed, the operator according to the need of the specifications of the produced steel reinforcement cage, and then discharge of concrete mix from the mixer, dump on the dumper, finally the quantitative feeding and artificial reinforcing cage into a mold into the conveyor belt, after the earthquake again after manual, product molding. Finished it on the ground of natural sun wind maintenance after a day can take off the film packaging, packaging after dizzy on the temporary dumps after product standard hardness can be shipped.
上面就是關于水泥隔離墩模具制作流程的簡單闡述了,感興趣的可以看下,不過上文只是一個大體的介紹,具體很多細節內容還是需要在生產中才能準確的掌握。
Above is briefly about cement isolation pier mold production process, may have a look of interest, but this is just a general introduction, the detailed content of many details still need to accurately grasp in the production.